Rail car cycle time improves

Reading Time: < 1 minute

Published: June 30, 1994

SASKATOON (Staff) — Rail car cycle times improved by about one percent in 1992, according to a study by the Grain Transportation Agency.

The agency says it took an average of 19.4 days for a rail car to be loaded with grain at a country elevator, travel to port and return empty to a country loading point. The year before the average was 19.6 days.

The length of the car cycle depends to a large extent on the type and volume of grain being moved. High volume commodities like wheat and barley have the lowest cycles, while special crops like peas and flax have the highest.

Read Also

Agriculture ministers have agreed to work on improving AgriStability to help with trade challenges Canadian farmers are currently facing, particularly from China and the United States. Photo: Robin Booker

Agriculture ministers agree to AgriStability changes

federal government proposed several months ago to increase the compensation rate from 80 to 90 per cent and double the maximum payment from $3 million to $6 million

That’s reflected in the figures for individual ports. At the West Coast, where large volumes of wheat, barley and canola predominate, cycle times improved to 19.2 days at Vancouver (down from 20.9 the year before) and 19.7 at Prince Rupert (20.4).

At Thunder Bay, where special crops requiring extra handling and car switching make up a larger portion of shipments, the cycle increased by 2.3 days to 19.6 days.

The numbers result from analyzing more than 250,000 individual rail car movements. Data for 1993 is still being collected.

explore

Stories from our other publications